JSON Schema
Machine-readable package and record contract.
P010/P011 production export pack
B037 gives the knowledge-production programme a stable, machine-readable route into P003. It validates the package before transfer while leaving editorial approval, scheduling, and substance entirely with P010/P011.
npm run validate:p010-export -- <package.json>Preflight only · cryptographic trust verified by P003Machine-readable package and record contract.
Producer-safe starting structure with required fields.
Stable validation codes for automation and remediation.
Local structural and editorial preflight before handoff.
Shared evidence gate for P010/P011 and P003.
Handoff evidence
A successful producer preflight does not publish anything. The shared gate continues through signing-key trust, P003 staging regression, accountable promotion approval, and a named rollback target.
Approval identifier and authority
Source revision and SHA-256 hash
ISO timestamp and slug
Validation output
Key identifier and custody record
Snapshot and test report
Approval and rollback target
Stable error contract
Blocking errors stop handoff. A future effective date is a non-blocking warning: the package may enter scheduled staging, but promotion remains locked until the approved time.
Correct the manifest against the published JSON Schema.
Restore the authoritative P010/P011 programme identifier.
Regenerate the manifest from the final export set.
Route the record through its owning programme contract.
Keep it in the P010/P011 queue until accountable approval.
Do not export unless P010/P011 explicitly approves public visibility.
Remove all referenceOnly or NEVER_PUBLISH fixtures.
Complete signing-key registration before handoff.
Handoff may proceed for staging; promotion must wait until effective time.
Issue 003 boundary
P003 now provides the contract and tools. P010/P011 must still complete its queue, freeze the approved source revision, generate hashes, register the production signing identity, and submit the final package. P003 then stages and verifies it before an accountable promotion decision.
Reference evidence →Integration architecture →Engineering Journal →